Southern Queensland Correctional Precinct Stage 2 - Temporary Works Engineer

Tender ID: 438101

Tender Details

Organisation:
Tender #:
-  
Status:
Closed
Publish Date:
11 November 2020
Closing Date:
25 November 2020

Tender Description

Temporary Works engineer qualified to provide professional engineering services, registered either as RPEQ, NER or a CPEng(AU) / CPEng(NZ) in the appropriate discipline, and having at least 5 years of relevant design experience specific to the Temporary Works

Design Package.
 
Deliverables:
1. Assist the Construction Team in identification, planning and development of Temporary Works during the pre-contracts phase.
2. Coordinated methodology for all structural elements including FRP, precast, blockwork and structural steel for all building types (13no.)
3. Assist the Construction Team in creation of Inspection Test Plans (ITPs) for Temporary Work Elements.
 
Once the project moves into the delivery phase the TWE will move into the role of John Holland’s Proof Engineer. The Proof Engineer is an appropriately qualified and independent Temporary Works Engineer to provide Proof Engineering certification of all CAT 2 and CAT 3 Temporary Works. The Proof Engineer must; Meet the competency and experience requirements of the
Temporary Works Engineer;
 
1. Work for a different organisation to the Temporary Works Designer;
2. Complete a thorough independent review (not a desktop study) with full supporting calculations to certify the design as if they were the certifying Temporary Works Designer; and
3. Support the construction team Temporary Works Coordinator (TWC) to resolve any issues raised in a timely manner.

Proof Engineering Deliverables
 
1. Ensure the Temporary Works Design issued for proofing is in-line with the coordinated methodology.
2. Full verification of all design aspects relative to the strength, serviceability, structural performance and constructability of the Temporary Works package.
3. Design inputs, including loads, actions and assumptions are in accordance with specifications, codes, Statutory or Regulatory requirements, and compliance with Project Specifications
4. Documentation produced by the designer is adequate, including dimensions, details, specifications, and other requirements such as tolerances.
5. Ensure the design has met all design deliverables as specified in the Temporary Works Design Brief.
6. Supply John Holland with a Temporary Works Proof Engineering Certificate (JHFRM-DES-006-05), accompanied by the following;
 
a. List of any comments raised for action by the certifying Temporary Works Designer, with confirmation these have been closed out to the satisfaction of the Proof Engineer;
b. Design calculations; and
c. List of any exclusions or limitations to the certification.
 
7. Assist the Temporary Works Site Validator with the Permit to Remove including out of sequence requirements requiring further engineering and certification.