Castlecliff Water Main Replacement: Cameron East to Erin Road
Tender ID: 430202
Tender Details
Tender Description
Whanganui District Council (WDC) are inviting tenders from suitably experienced contractors for replacing the existing water main from Cameron East to Erin Road.
The scope of work includes but is not restricted to;
Note: The construction work will not be started until the 'Dry Season (November)'.
- Installation of all related 457 mm (OD) diameter concrete lined steel pipe replacement works (length 800 meters) including valves and joining as per concept drawing.
- Welding of the pipes, bends and fittings.
- Installation of laterals.
- Connect to the existing water mains at start.
- Private connection as required.
- Installation of a 50mm air valves, and a 50m connection as required.
- Installation of 2 culverts crossing new water main.
- Dead plated the finish point.
- Flushing, disinfection and pressure testing of new pipeline.
- Full reinstatement in line with existing conditions.
- Incorporation of materials supplied by the Principal into the contract works.
- Planned work shut-offs with appropriate public notice.
- Relocation/realignment of all other utilities that may be required in order to deliver the scope.
Location
Category
Engineering & Research & Technical Based Services : Material Testing Services
Industrial Production & Manufacturing Services : Metal Fabrication & Welding
Civil Construction Services : Road & Streetscape Construction & Maintenance
Water & Sewage : Pipeline Construction : Pipes & Valves & Fittings : Water & Sewer Main Construction