Awarded

Travelator Replacement, Griffith Health CTR (G40), Gold Coast Campus

Tender ID: 421800


Tender Details

Organisation:
Tender #:
2558160280BCONSCAP  
Status:
Awarded
Closing Date:
8 June 2020
Awarded Date:
13 August 2020

Tender Description

You are invited to submit a Tender for the execution and completion of the works described in accordance with the Drawings and Specification (if any) supplied herewith, the Griffith University Conditions of Tender & Conditions of Contract for ‘Minor Works’ herein, and any other information issued by the Principal for the purposes of tendering.

A MANDATORY SITE VISIT will be on Wednesday 27 May 2020 between 10am and 12pm. ​Request for an inspection time should directed to the project manager. Details provided in the relevant section. Due to COVID-19, all site inspections will be separate and limited to 1 person per company.
No additional costs will be approved by the Superintendent or paid by the Principal due to any failure on your part to appreciate the extent of the project and its impact on adjacent buildings or facilities, or to evaluate any constraints on access to the site of the works.

You are required to check that all Tender documents received match those listed on the accompanying Document Transmittal. Confirmation that you have received all the documents listed is to be provided to the Principal by signing a copy of the Transmittal where provided and returning it to the Principal in accordance with the requirements of the General Conditions of Tendering.

If you are unable to submit at Tender for whatever reason, you are requested to notify the project manager in writing stating the reason prior to the tender close date. This will assist us in preparing the tender evaluation, and will maintain your standing with the University as a potential tenderer for future works.

Possession of site will be from the date of the Letter of Acceptance unless noted otherwise.

The successful contractor will be appointed as the Principal Contractor and will negotiate access to the site with the Superintendent and campus representatives. Access is to be maintained to all areas of the campus during construction. 


Location