Julimar-Brunello Phase 2 Project - Precommissioning Services

Tender ID: 408821

Tender Details

Tender #:
-  
Status:
Closed
Publish Date:
18 December 2019
Closing Date:
31 December 2019

Tender Description

Subsea 7 scope of work for Julimar Development Phase 2 involves the project management, engineering, procurement, fabrication and installation of the following packages of work:

  • One 6-slot Julimar A manifold (transport and installation only);
  • 22km long 18” NPS CRA clad flowline from the Julimar A manifold (JULA) to the existing Brunello Crossover manifold (BRUA-XoM), that includes one 12” NPS In-Line Tee (ILT) for future expansion and two 18” NPS Flowline End Terminations;
  • 18” NPS CRA clad expansion tie-in spools connecting the flowline FLETs to the JULA and BRUA-XoM manifold (qty-3);
  • 8” NPS Duplex rigid well jumpers connecting Wells to the JULA manifold (qty-4);
  • One Spools Connection Assembly structure;
  • 22km long EHU split into 2 sections (a break point in the EHU is required at the ILT location for future expansion) and comprising HP & LP hydraulics, MEG and Chemical injection cores, as well as electrical power cores and fibre optics for field control and communication;
  • EFLs and HFLs connecting various subsea hardware components;
  • Testing and pre-commissioning operations. Offshore precommissioning operations include:
  • Subsea isolation testing;
  • Pipeline flood, clean, gauge and hydrotest;
  • Pipeline dewatering & conditioning;
  • Pipeline nitrogen packing;
  • Spool leak testing;
  • Umbilical testing (pressure, electrical, fibre optic) 

Location

Western Australia   :   Gascoyne   :   Goldfields/Esperance   :   Great Southern   :   Kimberley   :   Mid West   :   Peel   :   Perth Metropolitan   :   Pilbara   :   South West   :   Wheatbelt