Tender Description

⁠⁠⁠Following Stage 1, and the identification and prequalification of suitable Respondents to form each of the two panel tiers; LINZ is proposing to identify a Tier one (1) Panel Supplier to deliver the Masterton Hospital demolition. Full scope and project requirements are outlined within Appendix 1 Masterton Hospital Site Clearance Demolition Scope of Works. A brief project background and intended end state is provided below.

Project Background

The LINZ managed former Masterton Hospital is situated next to the Wairarapa District Health Board (WHB) new Masterton Hospital, they share vital services through the underground network of service tunnels.

There are three tenanted buildings in the middle of this site that are leased to Masterton Medical Centre, and will remain open and operational during this project.

The former Masterton Hospital buildings scheduled for demolition have been vacant for approximately 10 years, and the building conditions vary in structural integrity, weather tightness and environmental states. Consideration for minimising noise and vibration disruption to the tenanted buildings and neighbouring hospital are to be factored into the demolition methodology.

The Hospital is a fire risk and it is important to ensure that all buildings remain fire protected as long as practical in accordance with the Building Consent.

The project is divided into three separable portions, these are briefly described as follows:

  •  Enabling Works
  • Above ground demolitions
  • Below ground demolitions

For a detailed breakdown of the scope for each of the separable portions, please review Masterton Hospital Site Clearance Demolition Scope of Works .

Intended end state

The services are to be reconfigured and disconnected to enable the former and new hospital sites to operate independently of each other and must house the new services within their own boundaries.

The vacant built structures are to be removed and the site is to be finished in a clear, tidy and safe condition.

All works must be completed by no later than April 2021.