North Shore Health Hub - General Metal Works

Tender ID: 393977

Tender Details

Tender #:
-  
Status:
Closed
Publish Date:
13 August 2019
Closing Date:
27 August 2019

Tender Description

The Project consists of two Buildings, Tower A and Tower B, sitting atop a 5 storey Basement and 2 levels of podium.

The basement consists of car parking, loading dock and a linear accelerator bunker, whilst the podiums have a combination of entries, retail tenancies and tenancies. Above the podium, there is Tower A which is a 4 level Class 9a (Health) facility and Tower B which is a 6 level Class 5 (Commercial) facility. There is a proposed bridge to provide a link between the North Shore Health Hub and the existing North Shore Private Hospital over Reserve Road.

The project scope involves the design and construction of the base build works with integrated fit-out to be undertaken by the tenant.

There is also an existing warehouse on the site which is to be demolished as part of the scope.

The new building has a total GBA of approx. 44,500m2.

The extent of the works shall include the complete design and construction of the Subcontract Works, but not be limited to, all of the following, in accordance with the all other Subcontract Documents:

1. The Subcontractor shall design, supply, deliver, handle, install and certify general metalwork items, including all plant and equipment,
labour and associated materials necessary to complete the works. The works shall be complete in every respect, notwithstanding any
omissions or inadequacies of the drawings and/or specification.

2. The Subcontractor shall provide the complete trade, including but not limited to:
a) Bike racks – BR-01, BIK-01, BIK-02 and BIK-03;
b) Handrails – HR-02, HR-03, HR-06, HR-07 and HR-08;
c) Metal Gate – Denoted as DSP_E on AA83-0001;
d) Structural Steel Staircase – Leading from linac plantroom (Dock Low Level) to Bunker Lid (Dock High Level);
e) Perforated Metal Screen Features (MTL-02) – Around mechanical risers in podium outdoor area;
f) Bollards – BOL-01, BOL-02, BOL-03, BOL-04, BOL-05, BOL-06, & BOL-07;
g) Height Clearance Bar & Structure – Allow for 5off height bars in locations as per markup;
h) Trafficable Galv Steel Gatic Cover – MTL-04 & MTL-05. Note allow MTL-05 on ground level between grids A-1 and B-2
i) Exclusion Mesh Around Bunker Slab – MTL-01
j) Chair Link Fencing and Gates – FEN-01 and FEN-04;
k) Chain Link Gate – G-01, G-02 and G-03;
l) Single Swing Metal Gate – G-05;
m) Slat Screen and Gate – FEN-02;
n) Floor Mounted Bump Rail – BPR-01;
o) Column Guards – CG-02
p) Pipe Guard – PG-01, PG-02 and PG-03 – Allow 75 of each in tender
q) Stair Tactiles – TGSI-01;
r) Metal Tread Nosing – To all external stairs; and
s) SHS to support convex mirrors – Refer to MIR-C-02 and MIR-C-03 for locations/extent.