Closed

Port of Broome - Channel Optimisation Project Dredging Works

Tender ID: 359708


Tender Details

Tender #:
18  
Status:
Closed
Publish Date:
3 July 2018
Closing Date:
27 July 2018

Tender Description

⁠⁠⁠The Channel Optimisation Project comprises the dredging of the seabed at the specified locations in the Kimberley Ports Authority’s access channels, basin and berth pockets at the Port of Broome. All dredged material shall be transported and placed into the approved disposal sites. The quantity of the material above design levels is estimated to be approximately 83,490m3. Pre-Dredge, Progress and Clearance Surveys of the areas will be required to verify the dredging volume, progress and completion of the works.


Location