Burnie Cam Pipeline Construction
Tender ID: 330223
Tender Details
Tender Description
General: TasWater requires a new 630mm diameter and 450mm diameter water supply pipeline to be constructed between the existing trunk watermain in West Mooreville Road and the Cam Water Treatment Plant.
Installation of approximately 550m of DN630PE* pipeline including supply and installation of all fittings and valves
Installation of approximately 2890m of DN450PE* pipeline including supply and installation of all fittings and valves
Surface reinstatement works
Traffic Management during construction
Pipeline crossing of the Cam River
Quality, safety and environmental management during construction
* Note: The DN630PE and DN450PE pipes are Principal Supplied
Provision of "As Constructed" plans in accordance with TasWater's Asset Spatial Data Specification requirements prior to Practical Completion. The "As Constructed" plans shall show the detail features as described on website.
Further details are provided in the attached RFT document pack, please review all documents in the pack, before submitting a response. All questions must be directed through the electronic on-line forum available on the Tenderlink site. The forum closes 2 days prior to the RFT closing time.
No direct contact is to be made with any TasWater Representative. Responses must be submitted electronically to the relevant Tenderbox by the closing time (2pm). Please allow sufficient time to up-load responses