Closed

Supply & Install Two Reverse Osmosis Plant

Tender ID: 295730


Tender Details

Organisation:
Tender #:
EOI 01-2016/17  
Status:
Closed
Publish Date:
17 December 2016
Closing Date:
17 January 2017

Tender Description

⁠⁠⁠The scope of works will include the delivery of four separate Work Package contracts:
1. Newman Airport Water Treatment Plant (WTP): supply and installation of a new water treatment plant based on the reverse osmosis process with pre-treatment and post-treatment. The water treatment plant is to supply an average of 60 kL/day (options of capacity to 100kL/day to be included) of potable water to a suitable water quality as defined by the SoEP. Construction of a new suitable fit-for-purpose building for the WTP.

2. Newman Airport Raw Water Infrastructure: supply and installation of associated Raw Water transport and storage infrastructure, as well as waste water transport and disposal infrastructure (storage / evaporation / infiltration dam). Supply and installation of ancillary components and connections where applicable. Decommissioning and demolition where applicable of existing redundant raw water, waste water or ancillary infrastructure where applicable. Preparation of services for Water Treatment Plant.

3. Cape Keraudren WTP: decommissioning, dismantling and containerisation of the existing Newman Airport RO Plant 03 to be relocated to Cape Keraudren. Supply and installation of new components as required as well as refurbishment of existing components where required. Supply of appropriate container for the new water treatment plant.

4. Cape Keraudren Raw Water Infrastructure: supply and installation of associated Raw Water transport and storage infrastructure, as well as waste water transport and disposal infrastructure (storage / evaporation / infiltration dam). Supply and installation of ancillary components and connections where applicable. Decommissioning and demolition where applicable of existing redundant raw water, waste water or ancillary infrastructure where applicable. Preparation of site and services for containerised Water Treatment Plant.
Respondents are invited to express their interest for one or multiple of the above Work Packages.

Note: There may be a delay in responding to questions lodged on the Public Forum (23 December 2016 - 3rd January 2017) due to the Christmas and New Year period, as such the Public Forum will remain open until 13 January 2017 to ensure all questions are responded to.


Location