Mount Annan Leisure Centre (MALC) Stage 2
Tender ID: 254055
Tender Details
Tender Description
The Tender Contract requires the selected Contractor to undertake a major refurbishment and extension to the Mount Annan Leisure Centre.
Works will be staged as follow:
1. Separable Portion 1 (SP1)
* SP1 shall include the following scope of works
* Relocation of Sydney Water Sewer Main
* Bulk earthworks and retaining walls to carpark
* Stormwater drainage and retention basin.
* Sports hall (excluding timber floor finish) with temporary carpet covering.
* Temporary Stage 2 entry, counters, services and communications for
* Sports hall and Pool hall as identified on Plan A03
* Any temporary works required to ensure safe public access to operational parts of the centre.
* All information and works required to obtain Occupation Certificate for the Sports hall.
2. Separable Portion 2 (SP2)
* SP2 shall include the following scope of works
* All remaining works under the contract
* Installation of timber flooring to sports hall
* Final works to the carpark
* All information and works to obtain Occupation Certificate for the remaining site works
* Landscaping
* Removal of temporary works
* The peripheral works will include new concourses with storm water drainage, new shade structure to existing concrete tiered seating, and a new backwash detention storage tank to be constructed underground and plumbed to sewer with pump out system.
To access the documents please visit The Tender Contract requires the selected Contractor to undertake a major refurbishment and extension to the Mount Annan Leisure Centre.
Works will be staged as follow:
1. Separable Portion 1 (SP1)
* SP1 shall include the following scope of works
* Relocation of Sydney Water Sewer Main
* Bulk earthworks and retaining walls to carpark
* Stormwater drainage and retention basin.
* Sports hall (excluding timber floor finish) with temporary carpet covering.
* Temporary Stage 2 entry, counters, services and communications for
* Sports hall and Pool hall as identified on Plan A03
* Any temporary works required to ensure safe public access to operational parts of the centre.
* All information and works required to obtain Occupation Certificate for the Sports hall.
2. Separable Portion 2 (SP2)
* SP2 shall include the following scope of works
* All remaining works under the contract
* Installation of timber flooring to sports hall
* Final works to the carpark
* All information and works to obtain Occupation Certificate for the remaining site works
* Landscaping
* Removal of temporary works
* The peripheral works will include new concourses with storm water drainage, new shade structure to existing concrete tiered seating, and a new backwash detention storage tank to be constructed underground and plumbed to sewer with pump out system.
To access the documents please visit www.tendersonline.com.au/hines.
Location
Category
Building Products & Materials : Floor Coverings : Sheds & Shelters & Shade Structures
Building & Facility Construction & Maintenance Services : Commercial & Industrial Construction Services : Landscaping
Civil Construction Services : Carpark & Driveway Construction & Maintenance : Civil & Earthworks (General) : Retaining Wall Construction : Stormwater Harvesting & Drainage Construction
Water & Sewage : Water & Sewer Main Construction : Water Tanks