St Peters and Gilberton Swing Bridge Refurbishment
Tender ID: 251685
Tender Details
Tender Description
TE:2015.17 - The refurbishment of the St Peters and Gilberton Swing Bridge.
Works include:
* Replacement of the marine ply deck and supporting ply joists with an environmentally sustainable fibre board composite;
* Replacement of all flat bar support straps;
* Replacement of all bolts, nuts and screws;
* Replacement of the existing eight (8) wire ropes;
* Retaining existing cast iron anchor support frames, break away existing concrete foundation beams, clean and then repaint with an acrylic elastomeric coating;
* Recasting anchor support frames into new reinforced concrete foundation beams with screw piles to resist lateral and vertical loads;
* Adding a flexible wire mesh to the balustrade;
* Upgrading the Western approach staircase (Gilberton end) by recasting the reinforced concrete staircase with balustrades on both sides, tactile grip indicators and non-slip nosings; and
* Upgrading the eastern abutment by clearly delineating the approach footpath from the footpath that travels through the River Torrens Linear Park.
Location
Similar Tenders
Related tenders matching this tender's categories and regions.