Rio Tinto’s proposed South of Embley project is located approximately 40 km south-west of Weipa in far North Queensland, Australia. The contractor is expected to manufacture and supply concrete for the Project.
The scope of work includes but is not limited to the following:
* Mobilisation of an initial batch plant and static batch plant to the Project site.
* Commissioning, operation and the demobilisation of the Batch Plant.
* The Supply and testing of all material and equipment required in the production of concrete
* Trial mixing of the different concrete mixes as required
* Provide agitator tucks to mix the concrete and deliver to the pour sites.
* Provide all labour, supervision and technical support to enable the safe operation of the plant at all times.
The on-site plants are to be sized and configured to enable the following minimum output rates to be maintained throughout the nominated hours of work (including meal breaks) during the peak demands of the Project:
Initial mobile concrete batch plant: 20-30 m³/hr
Static concrete batch plant: 60-80 m³/hr