Closed

Horseshoe Lake Stormwater Drainage Network Infrastructure Upgrade Project

Tender ID: 214307


Tender Details

Organisation:
Tender #:
BUNBUR-668465  
Status:
Closed
Publish Date:
1 February 2015
Closing Date:
6 February 2015

Tender Description

⁠⁠⁠The City of Bunbury (City) is proposing a major upgrade of its stormwater infrastructure within East Bunbury's Leschenault Catchment area. A key initial project will focus on the sub-catchment surrounding Horseshoe Lake (HSL) and will be delivered in (up to) four phases:

Phase 1 - Investigation and Design
Phase 2 - Construction; Horseshoe Lake to Preston River Discharge Line
Phase 3 - Construction; Horseshoe Lake Pump Station
Phase 4 - Construction; Stubbs Close Pump Station and Associated Works

The City invites Tenders from organisations wishing to provide design and consultancy services for the Horseshoe Lake Stormwater Drainage Network Infrastructure Upgrade Project Phase 1 - Investigation and Design (Phase 1). The Scope of Work totalling Phase 1 requires a suitable Contractor to provide design and consultancy services as specified.

Closing Date/Time: 06/02/2015 (3:00 p.m. WA)


Location


Similar Tenders

Active opportunities matching this tender's categories and regions.