Pit Dewatering - Pipe and Fittings Supply
Tender ID: 193608
Tender Details
Tender Description
Supply a range of HDPR pipes and fittings including various valves for installation as part of in pit dewatering activities at the Roy Hill mine site. Approximate quantities and sizes are outlined below (these will be refined later in the detailed Scope of Works at tender stage):
* 5000 each of DN250 an DN315 HDPE pipe
* 8 lengths of DN250 and DN300 Mining Hose
* 10 DN250 and DN300 Butterfly valves
* 10 DN250 and DN300 Non-return valves
* Associated HDPE fittings including all nuts, bolts, gaskets, stub flanges and backing rings to accommodate connection
First pipe is to be delivered to site by 01/09/2014.